[PR #137] [MERGED] Fix Link on Reactions+ Plugin #140

Closed
opened 2026-03-01 15:36:42 +03:00 by kerem · 0 comments
Owner

📋 Pull Request Information

Original PR: https://github.com/bludit/plugins-repository/pull/137
Author: @ghost
Created: 4/30/2020
Status: Merged
Merged: 4/30/2020
Merged by: @dignajar

Base: masterHead: master


📝 Commits (1)

📊 Changes

1 file changed (+1 additions, -1 deletions)

View changed files

📝 items/reactions-plus/metadata.json (+1 -1)

📄 Description

A slash was missing. Sorry D:


🔄 This issue represents a GitHub Pull Request. It cannot be merged through Gitea due to API limitations.

## 📋 Pull Request Information **Original PR:** https://github.com/bludit/plugins-repository/pull/137 **Author:** [@ghost](https://github.com/ghost) **Created:** 4/30/2020 **Status:** ✅ Merged **Merged:** 4/30/2020 **Merged by:** [@dignajar](https://github.com/dignajar) **Base:** `master` ← **Head:** `master` --- ### 📝 Commits (1) - [`77e0b3e`](https://github.com/bludit/plugins-repository/commit/77e0b3e0e5255be40d112bcfeb42689f64309a03) Fix Link ### 📊 Changes **1 file changed** (+1 additions, -1 deletions) <details> <summary>View changed files</summary> 📝 `items/reactions-plus/metadata.json` (+1 -1) </details> ### 📄 Description A slash was missing. Sorry D: --- <sub>🔄 This issue represents a GitHub Pull Request. It cannot be merged through Gitea due to API limitations.</sub>
kerem 2026-03-01 15:36:42 +03:00
Sign in to join this conversation.
No labels
pull-request
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
starred/plugins-repository#140
No description provided.